Skip to main content
All Posts By

nca-wp-admin

NCA Container- und Anlagenbau

Ferdinand Bridge

By Bridge Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Ferdinand Cycle Bridge Ötztal

For the expansion of the Ötztal Cycle Path, the Ferdinand Cycle Bridge was constructed over the Ötztaler Ache in Längenfeld. The bridge has a span of 65.7 meters and was manufactured in execution class EXC3 according to EN 1090-2.

Due to the confined space conditions on-site, the 72-metric-ton structural steelwork was fully pre-assembled at an assembly site. Transport to the lifting point was carried out using special module transporters. The final positioning was performed with two mobile cranes.

Scope of Services:
Delivery and assembly of the structural steelwork, including corrosion protection and bridge equipment

Client:
PORR Bau GmbH, Civil Engineering / Tyrol Branch

Execution Period:
Summer 2018

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
Orbital Seam Platforms (3)

MCE – Orbital Seam Platforms and Moveable Platforms P10

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

MCE – Orbital Seam Platforms and Moveable Platforms P10

To expand the production line for the new Airbus A350XWB aircraft type at the Hamburg plant, the manufacturing area was extended by one positioning and one finishing workstation.

A special lifting platform was required to improve accessibility to these new workstations. On behalf of Bilfinger MCE GmbH, NCA took over the machining, fabrication, pre-assembly, as well as the transport and commissioning of two personnel lifting platforms – so-called Moveable Platforms P10.

Scope of services:
Fabrication of two lifting platforms including pre-assembly, transport, and commissioning
Weight: 30 t
Material: S235JR+AR, S355J2+N, 1.4301, AlMg3
Material thicknesses: 0.5 – 60 mm

Client:
Bilfinger MCE GmbH

Owner:
AIRBUS

Architect / Planner:
Bilfinger MCE GmbH

Execution period:
5 months

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau reference project

Eurovision Baku Crystal Hall

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Eurovision Baku Crystal Hall

The 2012 Eurovision Song Contest was held in the “Baku Crystal Hall,” which we co-constructed. The inner roof realized by NCA – consisting of 2,700 metric tons of steel – is an architectural highlight and demonstrates our expertise in the construction of complex, large-span structures to be implemented on short notice.

The main roof trusses rest on two tubular columns each at a height of nearly 20 m and span a free width of 80 m – making the structure appear to literally float above the stage area. Additionally, NCA was responsible for the installation of approximately 1,500 metric tons of the external crystal facade – about 50% of the total facade area.

The project documents the trust in our company’s international experience and was completed on schedule within just 5 months on the grounds of the National Flag Square. The entire arena offers space for around 25,000 spectators.

Scope of services:
• Planning
• Structural engineering
• Calculation
• Manufacturing
• Transport
• Installation

Technical data:
• 2,700 t roof construction
• 1,500 t crystal facade (installation)
• Material: S355J2+N
• Plate thicknesses: 10 – 50 mm
• Main truss span: 80 m
• Construction height: approx. 20 m

Client:
Alpine Deutschland AG

Owner:
State Committee on Property Issues of the Republic of Azerbaijan

Architect / Planner:
gmp Architekten von Gerkan, Marg und Partner

Execution time:
5 months

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
baku-cc-1

Baku

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Baku

In early 2014, we received the largest order in our company’s history to date: the Convention Center in Baku, Azerbaijan.

Approximately 6,000 metric tons of steel structures, along with extensive roof and facade construction, presented an extraordinary challenge that we successfully met with expertise and precision within just twelve months.

A particular highlight of the project was the combination of complex structural analysis, a high-quality glass facade, and sophisticated standing seam roofs within an architecturally striking building.

The project was honored with the Meetings Star Award in the “Best Convention Centers in New Europe” category in 2020.

Scope of Services:
• Planning and Structural Analysis
• Calculation
• Manufacturing
• Transport
• Assembly

Technical Key Data:
• 11,000 m² Glass Facade
• 20,000 m² Standing Seam Roofs
• 37,000 m² Interior Facade Construction
• 57,000 m² C3 Paint System
• Total Weight: 6,000 t
• Material: S355J2+N
• Sheet Thicknesses: 10–80 mm

Client:
State Committee on Property Issues of the Republic of Azerbaijan

Developer:
ILK INSAAT SANAYI VE TICARET A.S.

Architect / Planner:
State Committee on Property Issues of the Republic of Azerbaijan

Execution Period:
12 months (from early 2014)

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau

Mariinsky Theatre

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Mariinsky Theatre

The Mariinsky Theatre in St. Petersburg is globally renowned as a symbol of Russian culture and artistic excellence. In an international architectural competition, Waagner-Biro Stahlbau AG was awarded the overall contract for the demanding new construction. The design by the renowned architectural firm Diamond Schmitt Architects (Canada) was selected due to its sensitive approach to the architectural heritage of St. Petersburg’s Old Town.

Commissioned by Waagner-Biro, NCA was entrusted with the implementation of numerous complex structural steelwork elements in the interior. Particularly noteworthy is the multi-story foyer with its impressive ceiling height, where several outstanding steel elements were realized.

The components realized by NCA include:
• a free-floating, cable-suspended oval staircase spanning several floors
• a 35 m long glass staircase that makes visitors appear to float between levels
• a VIP bridge for exclusive access to the gallery
• single and double-flight staircases
• various balustrades

Scope of Services:
Workshop-ready preparation of planning, fabrication, delivery, as well as fire and corrosion protection for a total of eight highly complex structural components

Client:
Waagner-Biro Stahlbau AG

Architect / Design:
Diamond Schmitt Architects (Canada)

Special Features:
• Historical context of the theatre (built in 1860 by Alberto Cavo, named after Maria Alexandrovna, wife of Tsar Alexander II)
• Premiere venue for numerous significant Russian works
• Stage for great international opera and ballet stars

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…