Skip to main content
Category

Energy

NCA Container- und Anlagenbau

Transformer Tank Construction

By Energy, Plant Engineering

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Transformer Tank Construction

Since 2020, we have once again been manufacturing bridge center sections (BMS) as well as transformer housings for Siemens Energy. Production is carried out in accordance with EN 15085 and includes up to 10,000 individual components per system with a total weight of up to 120 metric tons.

To ensure oil-tightness, specific technical specifications must be adhered to during the manufacture of the welded structures.

The trial assembly includes the assembly of the structural steel components, the complete piping of the system, and the acceptance by Deutsche Bahn and, if applicable, by the end customer. Finally, the coating is applied according to customer specifications.

Scope of services:
Manufacture of the entire steel structure including piping, trial assembly, acceptances, coating, and documentation

Client:
Siemens Energy Global GmbH & Co. KG

Execution period:
since 2020 – ongoing

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…