NCA Container- und Anlagenbau

ÖBB Bridge Unterlend

By Bridge Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

ÖBB Bridge Unterlend

Project Description:
As part of the new construction of an ÖBB bridge over state road L270 and the Salzach river in Unterlend, two new bridge superstructures were erected for Track 1 and Track 2.

The bridge has a span of 58.0 meters and a total weight of 487 metric tons. In addition to the new construction, the project also included the demolition and professional disposal of the existing superstructures.

Scope of Services:
Engineering, fabrication, corrosion protection, and assembly of the new construction, including demolition and disposal of the existing superstructures

Client:
Steiner Bau GmbH

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau Reference Project

Ringana

By Roofing and Facade Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Ringana

As part of the new construction of the production and office buildings for the natural cosmetics manufacturer Ringana in St. Johann in der Haide, we were contracted for the flat roof work.

A particular challenge was posed by the effects of the first COVID-19 lockdowns, which led to delays. Thanks to the dedicated efforts of our employees, all interim deadlines and the final completion date were nevertheless met.

The work performed included 12,850 m² of flat roof waterproofing on trapezoidal sheet metal and reinforced concrete ceilings, including vapor barrier, thermal insulation, roof drainage, and safety equipment for subsequent maintenance work.

Scope of Services:
12,850 m² flat roof waterproofing including vapor barrier, insulation, drainage, and safety equipment

Client:
Kostmann Bau GmbH

Execution Period:
May 2020 – March 2021

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
Rotrans

Rotrans Container Frames

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Rotrans – Container Frames

A series of wagon superstructures in the form of container frames was manufactured for the end customer’s rail-laying train. A complete unit consists of 19 container frames with various superstructures, such as buffer stops, length compensation units, rail roller stands, and other system components.

Production was carried out according to the requirements of Deutsche Bahn and EN 15085. The frames were coated, assembled, and delivered following a successful functional test.

Special features: Manufacturing in accordance with EN 15085 for railway components

Scope of work:
Manufacturing, coating, assembly, and functional testing of 19 container frames

Client:
Tool Tec Werkzeugbau GmbH

Execution period:
November 2021 – March 2022

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau

Transformer Tank Construction

By Energy, Plant Engineering

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Transformer Tank Construction

Since 2020, we have once again been manufacturing bridge center sections (BMS) as well as transformer housings for Siemens Energy. Production is carried out in accordance with EN 15085 and includes up to 10,000 individual components per system with a total weight of up to 120 metric tons.

To ensure oil-tightness, specific technical specifications must be adhered to during the manufacture of the welded structures.

The trial assembly includes the assembly of the structural steel components, the complete piping of the system, and the acceptance by Deutsche Bahn and, if applicable, by the end customer. Finally, the coating is applied according to customer specifications.

Scope of services:
Manufacture of the entire steel structure including piping, trial assembly, acceptances, coating, and documentation

Client:
Siemens Energy Global GmbH & Co. KG

Execution period:
since 2020 – ongoing

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau

Stössingbach Bridge

By Bridge Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Stössingbach Bridge

In the summer of 2019, the existing Stössingbach Bridge was renovated. The project included the dismantling of the old bridge structure, as well as the fabrication and assembly of a new bridge superstructure.
Special attention was paid to rapid implementation while traffic was ongoing and under confined space conditions, which required a high degree of logistics and precision.

Scope of Services:
Fabrication and assembly of the bridge superstructure

Client:
Porr Bau GmbH

Execution Period:
June – September 2019

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau Reference Project

Chassis Frame

By Structural Steelwork

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Chassis Frame

A chassis frame with a length of 20.5 m, a width of 2.9 m, and a height of 3.65 m was manufactured for Robel Railway Construction Machines. The component has a total weight of 24 metric tons and was precisely assembled, welded, and packaged at the factory.

The execution complied with the high quality standards of railway technology and was part of a special project in the field of mobile work vehicles.

Scope of Services:
Manufacturing: Assembly and welding including packaging

Client:
Robel Bahnbaumaschinen GmbH

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau reference project

Kanzianschütz Parndorf

By Roofing and Facade Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Kanzianschütz Parndorf

For the “Kanzianschütz Parndorf” project, extensive roofing and facade work for a modern commercial building was implemented between November 2019 and April 2020. Particular focus was placed on the fast and precise installation of prefabricated elements while maintaining high architectural and energy-efficient quality.

Collaboration with the client was carried out in close logistical and schedule-based coordination.

Scope of work:
Roofing and facade work

Client:
Haas Fertigbau Holzbauwerk GmbH & Co KG

Execution period:
November 11, 2019 – April 12, 2020

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…

Composite Steel Bridge

By Bridge Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Composite Steel Bridge

For an infrastructure project by Verbund AG, two composite steel bridges with a span of 21.2 meters and a bridge width of 6.21 meters were manufactured and installed. The total weight of the structure is 85 metric tons.

The project encompassed all services from planning and manufacturing to corrosion protection and professional on-site installation.

Scope of Services:
Engineering, Manufacturing, Corrosion Protection, and Installation

Client:
Steiner Bau GmbH
End Customer: Verbund AG

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau Reference Project

Duroflex Mattersburg

By Roofing and Facade Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Duroflex Mattersburg

In spring 2019, the roof and facade construction was implemented as part of an industrial building project for Duroflex in Mattersburg. The project involved precisely coordinated elements for the building envelope, which were planned in close cooperation with the client and completed on schedule.

The execution took place during ongoing production operations, which required particularly coordinated construction site logistics.

Scope of Services:
Roof and facade work

Client:
Haas Fertigbau Holzbauwerk GmbH & Co KG

Execution Period:
January 21 – May 17, 2019

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…
NCA Container- und Anlagenbau

Mayereinöd Bridge

By Bridge Construction

Reference Projects

Our reference projects demonstrate customized solutions and the highest quality in the fields of energy, environment, infrastructure, mobility, research & development, and sustainability. Let our versatility inspire you.

Mayereinöd Bridge

In the fall of 2017, we were awarded the contract to manufacture a new bridge near Mayereinöd in Salzburg as part of the flood protection measures along the Salzach river.

The new structure was designed as a composite bridge. Precast TT slabs with external reinforcement were used in the transverse direction—a solution that allowed for both high slenderness and a short construction period. All steel components and the reinforcement were manufactured in our plant and provided with the initial corrosion protection.

The main girders, each 25 meters long, were transported to the construction site and welded there. A particular highlight was the lifting of the 50-meter-long girders using a 600-metric-ton crawler crane—an event that also attracted numerous spectators from the surrounding area.

Scope of work:
Manufacturing, delivery, assembly

Client:
Steiner Bau GmbH

Execution period:
October 2017 – June 2018

ALL REFERENCE PROJECTS
NCA Container- und AnlagenbauBridge ConstructionÖBB Bridge Unterlend
27. November 2025

ÖBB Bridge Unterlend

ÖBB…
NCA Container- und Anlagenbau Reference ProjectRoofing and Facade ConstructionRingana
26. November 2025

Ringana

Ringana…
RotransStructural SteelworkRotrans Container Frames
25. November 2025

Rotrans Container Frames

Rotrans…
NCA Container- und AnlagenbauEnergyPlant EngineeringTransformer Tank Construction
24. November 2025

Transformer Tank Construction

Transformer…