Deutsch
English
  Hundsdorf 25, 9470 St. Paul/Lavanttal
+43 4357 3120-0
+43 4357 3120-540

References

Bridges connect people

A8 Piding
Early in february NCA received the order to construct the bridge A8 Piding. The weight of ...
Albona ski bridge
NCA received the order for the reconstructuion of the Albona ski bridge. This order includ ...
Sylvenstein bridge
The bridge is located below the Sylvensteintalsperre and was built in the year 1956. The b ...
Seebad- & Gamsjägersteg
The existing bridge has been damaged by a flood in 2014. The order included the constructi ...
Lateral shift Railway bridge Hüttau
After completion of the road and the edge of the beam structures were cross-moved to end p ...
Murbrücke Judenburg
This 187 m long and with a steel weight of 650 tons  heavy steel composite bridge was ...
Rettenbach Bridge
Following the resumption of the Pinzgauer local train was the next to the NCA Mühlbac ...
Mühlbach bridge
The Mühlbach bridge is a steel structure bridge. The bridge has the dimensions of 14. ...
Felixdorf Bridge
The ÖBB bridge Felixdorf - Blumau is a steel structure with orthotopic sheet .The bri ...
Ybbsbrücke
The bridge over the river Ybbs in Böhlerwek is a Composite structure. The height of t ...
Grünhübel Brücke
The Grünhübel bridge at Judenburg  is a composite structure. The height of ...