Seebad- & Gamsjägersteg
The existing bridge has been damaged by a flood in 2014. The order included the construction of the new structure with a total length of 27m.
Rubrik:
Bridges
Leistungsumfang:
Planning, construction and assembly of the bridge incl. transportation and lifting
Kunde:
Marktgemeinde Hofstätten-Grünau
Bauherr:
Marktgemeinde Hofstätten-Grünau
Architekt/Planer:
Schatz Bernhard
Ausführungszeit:
2 month
Eckdaten:
Weight: 13 ton; Material: S235JR+AR; Thickness: 4 - 40 mm