Sylvenstein bridge

The bridge is located below the Sylvensteintalsperre and was built in the year 1956. The bridge is the only way to cross the Isar between Lenggries and Sylvenstein. Because of the bad conditions of the bridge some parts had to be renewed. The contract contained a partly demolition of the substructures and the new construction of superstructure.


Rubrik:
Bridges
Leistungsumfang:

Construction, transportation and assembly of the structure

Construction assembly of the shifting track incl. accessories

Futhermore the whole corrosion protection at work and the welding of the field connections

Execution according to EN1090-2 EXC3

Kunde:
Porr Bau GmbH
Bauherr:
Freistaat Bayern
Architekt/Planer:
Baumann + Obholzer ZT GmbH
Ausführungszeit:
4 month
Eckdaten:
Weight: 100 ton; Material: S355JR+AR; Thickness: 6 - 55 mm