BMS Borwin
In April 2016 NCA was needed for the construction of a steel construction of two transformer boiler plants. The whole construction had over 100 tons, the heaviest part was the boiler with more than 45 tons.
Rubrik:
Power engineering
Leistungsumfang:
Construction of the whole steel structur for two power transformer incl. transport
Kunde:
Siemens AG - Nürnberg
Bauherr:
Siemens AG - Nürnberg
Architekt/Planer:
Siemens AG - Nürnberg
Ausführungszeit:
5 month
Eckdaten:
Weight: 100 ton; Material: S235JR+AR - S355J2+N, 1.4301 - 1.4571; Thickness: 4 - 60 mm