In October 2015 NCA was needed for constructing the steel construction of two transformer boiler plants. The whole weight of the construction was 48 tons. The heaviest part of the construction was the boiler with 35 tons. In our contract was not only the construction of the steel parts but also the pipeworks and the preassembly.


Rubrik:
Power engineering
Leistungsumfang:

Construction of the whole steel structur for two power transformer incl. transport

Kunde:
Siemens AG - Nürnberg
Bauherr:
Siemens AG - Nürnberg
Architekt/Planer:
Siemens AG - Nürnberg
Ausführungszeit:
3 month
Eckdaten:
Weight: 85 ton; Material: S235JR+AR - S355J2+N, 1.4301 - 1.4571; Thickness: 1 - 50 mm