Eichstraße bridge
During October 2017 we received the order to build the Eichstraße bridge in the center of Salzburg.
The arch bridge with a length of 70 meters was manufactured in our factory in St.Paul, the parts with special transports brought to Salzburg and mounted with the greatest possible consideration for the inner city conditions. The walkway was attached directly to the main structure. The shunting work took place during the night to ensure the safety and traffic flow as far as possible.
Rubrik:
bridge building
Leistungsumfang:
Production, assembly, moving works
450ton steel
Kunde:
SBV Zivilechniker GmbH
Bauherr:
city of Salzburg
Ausführungszeit:
april till august 2018