Opterra Karsdorf

The Karsdorf cement plant in Germany is part of OPTERRA Germany. At the Karsdorf site, about 1.5 million tons of clinker are burned each year in two furnaces. In order to meet the stricter requirements of the 17th BimSchV, the exhaust gases of the furnaces must be further embroidered from 1.1.2019.

This requires the use of forward looking environmental technologies. Our company was commissioned to build this prototype, which has been successfully in operation since 2019.  Our scope of supply consists of two newly developed AutoNOx, a regenerative SCR system, and all associated auxiliary units. Another important component is the conversion of the two existing electrostatic filter systems.


Rubrik:
Research and Development/Environmental technology
Leistungsumfang:

Commissioning of a prototype plant consisting of various construction components.

Among other things

400tons steel construction

100tons Piping and

100tons Apparatus construction

has been processed.

Kunde:
Opterra GmbH Germany
Bauherr:
Opterra GmbH Germany
Ausführungszeit:
march 2018 till july 2019