Deutsch
English
  Hundsdorf 25, 9470 St. Paul/Lavanttal
+43 4357 3120-0

Project Teich

In the course of building anew an additional regenerative post-combustion plant for the Teich Co., the pipe work for a new hall and exhaust air had to be constructed.

The NCA Co. designed, manufactured supplied and fitted the complete design. A total of 70 running metres of pipe from 900 – 3500 mm in diameter and parts from 6 – 12 m in length were completed in a manufacturing and run time of 2 months.