Deutsch
English
  Hundsdorf 25, 9470 St. Paul/Lavanttal
+43 4357 3120-0

wet electrostatic percipitator WESP Linz

An order to manufacture a structural steel construction for air pollution control system incl. wet electrostatic precipitator as well as a stair tower and maintenance platforms to the existing plant reached our company.
Executed in material S235JR+AR with painting according to factory standard as well as partial fire proof painting F30 for exposed supporting structures.


Rubrik:
structual steel construction
Leistungsumfang:

Manufacture of a technological steel structure with a total tonnage of approx. 200 tons according to EN1090-2 EXC3 including 3rd party factory acceptance tests by accredited bodies.

Kunde:
Austria/ Chemical industry
Ausführungszeit:
first quarter of 2019