After the new building and the increase of two office buildings at the area of AVL List GmbH in Graz, the connection of these two buildings took place with a two-storey pedestrian bridge in autumn 2008.

The company NCA manufactured and put up this architectural steel-girder construction. The bridge was fitted in and put up in 2 stages of construction between the two buildings.
In the first section, the bridge was put up with a length of 27 metres, a breadth of 20 metres and a total height of 20 metres between the two buildings. The bridge was covered with glass. The total weight of the steel/glass construction is about 50 tons.

In the second period, informers were inserted and screwed together for the concrete ceiling. The informers had a weight of 5.5 tons.

After only 3 months construction time, the connection bridge could be submitted to a wonderful view.


Ausführungszeit:
3 month
Eckdaten:
50 tons