Deutsch
English
  Hundsdorf 25, 9470 St. Paul/Lavanttal
+43 4357 3120-0

Working Chamber Linz

The Working Chamber in Linz was general rehabilitated in the period of 2007 to 2008. The storefront in the front of the building, which is protected as a historic monument, remains constant, and the storefront of the new constructed building was designed in the style of the historical front. The building has office and meeting premises into five floors. An inner courtyard, which is big and completely roofed and heated, is in the heart of the building.

Our performances covered:

  • The delivery and assembly of steel girders, which were obstructed in cement and composite construction.
  • The delivery of the steel construction for the connection brigdge between the AK and ÖGB building
  • The delivery and assembly of the steel girder construction for the inner courtyard roofing.
  • Tube construction for the portal construction in the upper floor
  • Fire protection coating of the components
  • Steel construction for the lift in the inner courtyard

Ausführungszeit:
12 month
Eckdaten:
480 tons