Deutsch
English
  Hundsdorf 25, 9470 St. Paul/Lavanttal
+43 4357 3120-0

Steel construction

wet electrostatic percipitator WESP Linz
An order to manufacture a structural steel construction for air pollution control system i ...
MCE
For AIRBUS in Hamburg NCA created a positioning and finishing building ground for the alre ...
Ship-access ramp
In behalf of Felbermayr GmbH & Co KG NCA was needed for the implementation of a heavy ...
Innerframe
For some weeks NCA created innerframes for a facade construction in behalf of the company ...
Working Chamber Linz
The Working Chamber in Linz was general rehabilitated in the period of 2007 to 2008. The s ...
AVL bridge
After the new building and the increase of two office buildings at the area of AVL List Gm ...
Skywalk Congresscenter Villach
Since the beginning of September this year, the Holiday Inn Hotel in Villach becomes conne ...
Wörthersee-Stadium Klagenfurt
The new constructed Wörthersee-Stadium is probably the most prominent and architectur ...
Heliport for Wolfsberg's hospital
The new helicopter base consits of a connection bridge made of steel and a non-slip landin ...
Project voestalpine cable bridge
The cable bridge measures 33 metres in length, is 1.70 metres wide and 2.13 metres deep. I ...