Mutterer bridge
An order to a new building construction of a railway bridge over the river Mühlbach was managed by us between october 2016 and november 2017. The bridge has a length from about 153 meters, a wide about 7 meters and is around 43 meters over the ground. The single elements of the bridge had a weigth up to 140 tons, therefor it was necessary to have a cran, that was 104 meters high and had a weigth from about 1200 tons, for lifting the single elements. The bearing structure is a three-span continuous beam, which has a variable heigh, layered on two reinforced concrete beams.
new building construction of a railway bridge over the river Mühlbach
length:153 m
wide: 7m
heigh :43 meters over the ground
weigth: up to 140 tons
a three-span continuous beam, which has a variable heigh, layered on two reinforced concrete beams.