Mutterer bridge

An order to a new building construction of a railway bridge over the river Mühlbach was managed by us between october 2016 and november 2017. The bridge has a length from about 153 meters, a wide about 7 meters and is around 43 meters over the ground. The single elements of the bridge had a weigth up to 140 tons, therefor it was necessary to have a cran, that was 104 meters high and had a weigth from about 1200 tons, for lifting the single elements. The bearing structure is a three-span continuous beam, which has a variable heigh, layered on two reinforced concrete beams.


Rubrik:
bridge building
Leistungsumfang:

new building construction of a railway bridge over the river Mühlbach

length:153 m

wide: 7m

heigh :43 meters over the ground

weigth: up to 140 tons

a three-span continuous beam, which has a variable heigh, layered on two reinforced concrete beams.

Kunde:
ARGE Neubau IVB Mutterer Brücke
Bauherr:
Innsbrucker Verkehrsbetriebe & Stubaitalbahn GmbH
Ausführungszeit:
october 2016 till november 2017