Almbridge A10

Our company was reached by an order to macufacture and deliever 11 steel composite girders for the Almbridge of the A10 Tauern motorway near Hallein. The transport of the girders was a challange, because the total length of a single girder was 44,6 meters and had to be transported in one piece.

The execution time for this project was from february 2019 till february 2020.


Rubrik:
bridge building
Leistungsumfang:

11 steel composite girders

total length(each): 44,6m

Kunde:
Porr Bau GmbH
Bauherr:
ASFiNAG Bau Management GmbH
Ausführungszeit:
february 2019 till february 2020