Albona ski bridge
NCA received the order for the reconstructuion of the Albona ski bridge. This order included the verifiable calculations, the construction of the bridge and the erection.
Rubrik:
Bridges
Leistungsumfang:
Execution according to EN1090-2 EXC3
Construction, transportation and assembly of the structure
Futhermore the whole corrosion protection at work
Welding of the field connections
Kunde:
Porr Bau GmbH
Bauherr:
Stuber Fremdenverkehrs GmbH
Architekt/Planer:
Baumann + Obholzer ZT GmbH
Ausführungszeit:
4 month
Eckdaten:
Weight: 90 ton; Material: S235JR+AR - S355JR+AR; Thickness: 10 - 55 mm