Rettenbach Bridge
Following the resumption of the Pinzgauer local train was the next to the NCA Mühlbach bridge and the bridge Rettenbach manufactured and assembled.
Length is 9.0 m, weight about 8.5 tonnes.
Eckdaten:
8,5 tons
Following the resumption of the Pinzgauer local train was the next to the NCA Mühlbach bridge and the bridge Rettenbach manufactured and assembled.
Length is 9.0 m, weight about 8.5 tonnes.