This 187 m long and with a steel weight of 650 tons  heavy steel composite bridge was installed in the incremental launching method. It was on the two longitudinal axes 22 carriers in length from 16 to 18.5 m and inserted a weight of up to 34 to the Mur.

The maximum span between the piers is 60.0 m.

Furthermore, was the formwork carriage for the production of the road planned by the NCA and manufactured.


Eckdaten:
650 tons