For AIRBUS in Hamburg NCA created a positioning and finishing building ground for the already existing production line of the airplane type A350XWB. To guarantee the accessability of the building ground a jack-up plattform was needed. NCA was needed for the mechanic processing and the manufacturing of the jack-up plattform.
Rubrik:
Steel construction
Leistungsumfang:
Construction of two jack-up plattforms incl. transport
Kunde:
Bilfinger MCE GmbH
Bauherr:
AIRBUS
Architekt/Planer:
Bilfinger MCE GmbH
Ausführungszeit:
5 month
Eckdaten:
Weight: 30 tons; Material: S235JR+AR - S355J2+N, 1.4301, AlMg3; Thickness: 0,5 - 60 mm